摘要
建立了M/M/C/m/m排队系统的基本模型、针对天津市紫金花园地下挖土工程进行了施工优化组织设计,从而得到最佳经济效益的施工方案。
In this article,the author sets up a basic model of M/M/G/m/m arrangement system and carries out optimized construction management plan about underground earthwork of Zi Jin garden in Tianjing city thus.getting a constructing scheme with the best economic benefit.
出处
《辽宁工程技术大学学报(自然科学版)》
CAS
1998年第3期272-274,共3页
Journal of Liaoning Technical University (Natural Science)