摘要
在超长混凝土大梁施工中,对模板、排架支撑、施工后浇带、混凝土级配、混凝土浇筑及养护采取了相关的技术措施,有效地控制了裂缝的产生。
A relative technical measures was taken in the placement of super long concrete beam, regarding formwork, trestle bracing, post-poured construction belt, concrete gradation, concrete placement and curing. By all these measures, crack is effectively controlled.
出处
《建筑施工》
1998年第4期1-3,共3页
Building Construction
关键词
混凝土大梁
模架
施工技术
裂缝控制
浇筑施工
concrete beam
formwork system
construction technology
crack control