呼和浩特新火车站预应力张弦梁施工技术 被引量:3

Construction Technology of Prestressed Steel Beam String Structure in Hohhot New Railway Station
下载PDF
导出
摘要 呼和浩特新火车站无站台柱雨篷采用54m跨张弦梁结构。为加快施工进度,钢结构施工设计中将两榀张弦梁组合成一个施工单元进行张拉、起吊、滑移,并在实际施工中顺利实施。介绍两榀一体化张弦梁施工技术,包括张拉技术、张弦梁起吊、滑移方案。提出多种两榀一体化张弦梁的起吊方案,最终根据该工程特点选择最优的一种。同时,对施工过程的索力、结构变形和钢结构应力进行仿真模拟计算。 The 54m-span beam string structure has been used in the steel roof of the rainproof of awning without platform column in Hohhot New Railway Station. Two string beams are connected together to form a construction unit to be tensioned, suspended and slided in construction design of steel structure for mending construction rhythm and the design project has been actualized in actual construction. Authors introduce the construction technology of beam string structure and construction schemes of suspending and sliding technology. Several construction schemes of suspending had been brought forward and the best one was chosen which can be suited for the characteristic of the project. Besides, cable force, deformation and steel structures stress are simulating calculated.
出处 《施工技术》 CAS 北大核心 2009年第7期36-39,共4页 Construction Technology
关键词 预应力工程 张弦梁 两榀一体化施工 模拟分析 prestress beam string incorporate technology of two beams simulation analysis
  • 相关文献

参考文献3

共引文献16

同被引文献8

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部