204国道东台段改扩建工程水泥稳定碎石配合比设计及施工 被引量:1

Design and Construction of Cement Stabilized Gravel Mixture Ratio for National Highway 204 Dongtai Section Reconstruction Extension Project
下载PDF
导出
摘要 该文结合204国道盐城南段(东台段)改扩建工程水泥稳定碎石路面基层的工程实践,从原材料选择、施工配合比设计、试铺、拌和、摊铺、碾压等工序上详细介绍了水泥稳定碎石路面基层施工要点与方法。 Combined with the engineering practice of the cement stabilized gravel pavement base of the National Highway 204 Yancheng South Section(Dongtai Section) Reconstruction Extension Project,the article introduces in detail the construction gist and methods of the cement stabilized gravel pavement base from the construction procedure of selecting the raw materials,designing the construction mixture ratio,pre-paving,mixing,spreading,rolling and so on.
出处 《城市道桥与防洪》 2009年第7期148-152,共5页 Urban Roads Bridges & Flood Control
关键词 水泥稳定碎石 配合比设计 级配 施工 cement stabilized gravel,design of mixture ratio,gradation,construction
  • 相关文献

参考文献4

  • 1JTJ034-2000,公路路面基层施工技术规范[S].人民交通出版社.
  • 2东台市交通局.盐城市204国道扩建工程水泥稳定碎石基层施工指导意见[Z].
  • 3南通路桥工程有限公司.204国道东台段水稳基层施工组织设计、施工技术方案[Z].
  • 4南京东交工程检测有限公司.204国道东台段水稳基层配合比设计[Z].

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部