期刊文献+

关于注水试验不适合均质土坝坝体渗透性测试的讨论 被引量:5

Discussion on water injection test inapplicability to the permeability test for homogeneous earth dam
下载PDF
导出
摘要 分析讨论了注水试验这一原位试验方法,认为该方法对于均质土坝坝体渗透性测试存在较大误差,特别是对于小型水库较为单薄的大坝坝体基本上不适用;现行规程、规范关于坝体注水试验的有关规定尚值得商榷,如果实在要将该方法推广应用于类似均质土坝坝体这样的孤立式非半无限空间的人工填筑土体的渗透性测试,建议另行研究和推导渗透系数的计算公式。 The in situ method of a water injection test is discussed. This method is prone to error when used for permeability tests of homogeneous earth dams. In particular, it is not suitable for the relatively thin-walled dam of the small reservoir. The current standards and regulations of clam injection tests are worth discussing. If we want to use the method for the pemaeability test of isolated and not hail-spaced artificial filling soil, the formula of the permeability coefficient should be reviewed.
作者 韦港 闫宇
出处 《水利水电科技进展》 CSCD 北大核心 2009年第4期18-20,共3页 Advances in Science and Technology of Water Resources
关键词 注水试验 渗透系数 规程规范 均质土坝 除险加固 water injection test permeability coefficient standards and regulations homogeneous earth dam danger control and reinforcement
  • 相关文献

参考文献1

  • 1SL 55-2005.中小型水利水电工程地质勘察规范[S],2005.

同被引文献23

引证文献5

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部