新疆水泥厂2000t/d超短窑生产线是我国西北高寒地区第一条现代化的新型干法工艺线,具有80年代国际先进水平,为我国“七·五”重点项目。作者全面地介绍了该线从立顶、引进谈判设计和投产的全过程;回顾在建设和调试过程中矿山、生料制备、煅烧、水泥粉磨、包装出厂及自动化控制等关键环节所解决的问题,并介绍了有关生产数据。对于工程中存在的不足之处和为适应当前市场经济的形势尚待改进的问题进行了认真的反思。
Xinjiang Cement Plant 2000t/ d short kiln production line is the first modem dry process line in the low temperature area of north west China.lt is a major project of the Seventh Five - Year Plan, and stabs in the world advanced level of 1980' s. The authors introduce the whole procedure from establishing the project, negotiation of imported equipment, and designing up to puning into operation.Regarding to, the problena encountered during the stages of colistmction and commissioning in various links, such as quarry, raw meal preparation, buming, cement grinding, Packing and automatic control, the authors made an earest review of the weaopoints occured in the construction and the problems to be improved in order to suit the current market economy.
出处
《水泥技术》
1998年第4期3-8,共6页
Cement Technology