摘要
文章以新建库鲁塔格隧道爆破施工为例,通过进行爆破振动测试,分析爆破施工过程中既有隧道的爆破振动速度与微应变之间的相互关系,研究新建隧道爆破施工对临近既有隧道的影响。
The article uses the blasting operation of the newly established Kulutage Tunnel as an example to study and analyze the side effects of blasting operations to nearby existing tunnels.The blasting vibration testing was used during the tests and correlation between the vibrating speed and micro-strain is analyzed based on the test results.
出处
《西部交通科技》
2009年第4期45-48,90,共5页
Western China Communications Science & Technology
基金
中铁二十一局课题项目<新建隧道爆破振动影响阈值的研究>
关键词
爆破振动速度
微应变
既有隧道
振动破坏
Blasting vibration speed
Micro-strain
Existing tunnel
Vibrating destruction