期刊文献+

高支模封闭超高层建筑水平楼板施工技术 被引量:7

Construction Technology of High-Formwork Closed Horizontal Floor in Super Tall Building Structures
原文传递
导出
摘要 结合具体工程,针对304.874m高空处的高支模施工难点,采取了在下一层剪力墙上预埋钢板、焊接工字钢梁、搭设模板支撑等方法,从施工流程、施工要点以及安全措施等方面对超高层建筑结构水平楼板的全封闭施工进行了探讨。工程实践表明,高模板的施工安全,可供其他类似工程的施工参考。 In order to solve the difficulties of the high-formwork at the 304.874 meters high level, various measures such as preembedded steel plate on the next floor shear wall, welded I-steel beams and installed formwork supports were adopted, and the construction technology of the high-formwork closed horizontal floor in the super tall building structures was explored from the construction process, construction key points, and safety measures. It is shown from the practical application that the installing method of high butt formwork is safety, which can provide the reference for the other similar projects.
出处 《建筑科学》 北大核心 2009年第7期80-83,共4页 Building Science
关键词 超高层建筑结构 高支模 施工 tall building structures high-formwork construction
  • 相关文献

参考文献2

共引文献14

同被引文献11

引证文献7

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部