介绍威海港二期工程卸荷板下棱体抛石的施工方法及质量标准,建议再次修订《质量检验评定标准》和《港口水工建筑工程定额》时,应考虑增加卸荷板下棱体抛石的项目内容。
Abstract The construction method of riprap prism under relieving slab of Weihai Port phase Ⅱ quay project and quality controll are introduced.It is suggested that as items the above said should be included while revising the 《Criteria of Inspection and Assessing of Port Engineering》.