期刊文献+

辽河大桥大直径深水超长桩基础桩底压浆的关键技术

Key Techniques for Pile Foot Grouting of Large Diameter,Deep Water and Overlong Piles Foundation of Bridge over Liaohe River
下载PDF
导出
摘要 辽河大桥39#主塔桩基础为大直径深水超长群桩基础,对全部39根桩进行了桩底后压浆,有效地提高了桩基承载力和整体刚度,减少了基础的不均匀沉降。重点介绍大规模群桩基础通过桩底压浆提高承载力的机理、压浆工艺及压浆效果。 The foundation of 39# main tower pile of bridge over Liaohe River is one of pile group with large diameter, in deep water and overlong. After grouting the foots of all 39 piles is carried out, effectively enhancing the bearing capacity of pile foundation and its integral rigidity and reducing the inhomogeneous settlement of foundation. The paper emphatically introduces that large - scale pile group foundation lifts mechanism of bearing capacy through pile foot grouting;grouting technology and effects.
作者 马文胜
出处 《北方交通》 2009年第7期62-65,共4页 Northern Communications
关键词 辽河大桥 群桩基础 桩底压浆 承载力 机理 效果 Bridge over Liaohe River Foundation of pile group Pile foot grouting Bearing capacity Mechanism Eftects
  • 相关文献

参考文献3

二级参考文献4

  • 1刘金砺.桩基础设计与计算[M].北京:中国建筑出版社,1994..
  • 2翟晋.自平衡测桩法的应用研究[M].东南大学,2000..
  • 3沈保汉.影响钻孔灌注桩承载能力的施工因素[J].建筑技术科研情报,1981,(3):47-53.
  • 4沈保汉,建筑技术科研情报,1981年,3期,47页

共引文献392

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部