摘要
分析印尼风港电厂负压自动调节投入的几个难点,对现场设备及DCS的控制逻辑进行了优化,成功地解决了这些难题.
The paper analyzes a couple of difficulties since putting the furnace draft autoregulation into operation in LABUHAN ANGIN Power Plant in Indonesia and develops the methods to optimize the equipments on the jobsite and DCS control logics, and thus, the problems are successfully solved.
出处
《自动化信息》
2009年第7期65-66,共2页
Automation Information
关键词
炉膛负压
自动调节
优化
Furnace Draft
Auto-regulation
Optimization