摘要
In this paper,daily production scheduling is studied based on the Third Steelmaking Plant of Wuhan Iron and steel corporation (WISCO). To make sure the daily production plan is feasible,method of casting group is established,and the compatibility between two converters and three continuous casting devices in the Third Steelmaking Plant of WISCO is analyzed. The process flow chart of daily production scheduling is given in this paper. Then,algorithms and procedures for the simulation of daily production plan is developed. Using the actual data from the Third Steelmaking Plant,the feasible daily steelmaking plan and cast plan are given. The plan contains 7 groups of cast plan,figured out 54 converters,and about 13,500 tons steel.
In this paper, daily production scheduling is studied based on the Third Steelmaking Plant of Wuhan Iron and steel corporation (WISCO). To make sure the daily production plan is feasible, method of casting group is established, and the compatibility between two converters and three continuous casting devices in the Third Steelmaking Plant of WISCO is analyzed. The process flow chart of daily production scheduling is given in this paper. Then, algorithms and procedures for the simulation of daily production plan is developed. Using the actual data from the Third Steelmaking Plant, the feasible daily steelmaking plan and cast plan are given. The plan contains 7 groups of cast plan, figured out 54 converters, and about 13,500 tons steel.
出处
《中国管理信息化》
2009年第15期120-123,共4页
China Management Informationization
基金
supported by National Natural Science Foundation of China through approved No.70672102
关键词
炼钢
连续铸造
兼容性
转炉
Production Plan Simulation
Steelmaking
Continuous Cast