摘要
文章介绍了一种典型的PTFE内衬石墨填料塔。对PTFE内衬石墨填料塔的安装质量提出了主要关注点,提出了安装前准备的相关技术特点及安装过程的质量控制要点。对此类塔的典型结构安装过程进行了分析,提出了安装此类塔的一般步骤和注意点,为塔安装的工程应用提供了实践经验和相关参数。通过分析PTFE内衬石墨填料塔的安装质量研,为工程应用提供了参考,为行业内的此类技术交流提供了交流方向。
The paper introduced a typical PTFE lining graphite packing column. Put forward the key point about the PTFE lining graphite packing column assembly quality and also including the technical speciality of the preparation before the column assembly and the quality control node. The typical series column's assembly process were analyzed and brought forward the normal schedule of the column assembly with the experience and related parameter used in the project of the column assembly. Through the analysis of the assembly quality research to the PTFE lining graphite packing column, set up a typical sight for the column using in the engineering. The paper showed a direction of the technology communication in the field.
出处
《广东化工》
CAS
2009年第7期238-239,271,共3页
Guangdong Chemical Industry
关键词
PTFE
石墨
内衬
塔节
翻边
PTFE
graphite
lining
column section
flanging