2Joel P. Stinson, Edward W. Davis and Bsheer M. Khumawala, Multiple Resource-Constrained Scheduling Using Branch and Bound[]]. ALLE Transaction.1987,10 252-259.
3N.Christofides,R.Alvarez-valdes.J.M.Tamarit,Project Scheduling with Resource Constraints: A Branch and Bound Approach, European Journal of Operational Research[J]. 1987,29: 262-273.
4Demeulemeester, E. L. and Herroelen. A Branch and Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem[J]. Management Science, 1992,38:1803-1881.
5Peter Brucker, Andreas Drexl, Roll M hring, Klaus Neumann and Erwin Pesch,Resource-constrained Project Scheduling : Notation, Classification, Models and Methods[J]. European Journal of Operational Research, 1999.112:3-41.
6Shigeru Tsubakitani and Richard F.Deckro. A Heuristic for Multiproject Scheduling with Limited Resources in the Housing Industry [J]. European Journal of Operational Research, 1990,49:80-91.
7E.William East, Infrastructure Work Order Planning Using Genetic Algorithm [C] Proceedings of the Genetic and Evolutionary Computation Conference,1999,1510-1516.