提出自动发电控制(AGC)的平滑控制和"负荷断点"问题,并给出解决该问题的实际应用方案。在发电机组AGC运行模式的基础上,通过"经济AGC控制装置",根据入炉煤的发热量变化,建立煤的发热值数学模型,自动计算出需要启动或停止磨煤机的"负荷断点"位置。其主要控制方法为:某台机组在按照AGC指令升降负荷中遇到"负荷断点"时,可以把AGC的指令改控另一台机组,从而既保证了AGC负荷的连续性,又避免了磨煤机的启/停控制。
The "load break" problem and its solution is given. For unit AGC AGC (Automatic Generation Control) operation mode, a mathematic model is smooth control established in is presented the economic AGC control device to automatically calculate the "load break" point according to actual coal heat value for unit,where a coal mill should be started up or stopped. The control strategy is that,when the unit under AGC reaches a "load break" point,the AGC command will be shifted to another unit to keep the continuity of AGC load and avoid the starting and stopping control for the coal mill.
出处
《电力自动化设备》
EI
CSCD
北大核心
2009年第8期114-117,共4页
Electric Power Automation Equipment
关键词
AGC
经济运行
优化
平滑控制
负荷断点
磨煤机
AGC
economical operation
optimization
smooth control
load break
coal mill