期刊文献+

近邻地铁地下连续墙全过程开挖变形分析 被引量:1

ANALYSIS ON DEFORMATION OF CONTINUOUS CONCRETE WALL IN COMPLETE CONSTRUCTION PROCESS
下载PDF
导出
摘要 在位移要求严格控制的深基坑设计中,一般采用地下连续墙作为围护结构。以上海近邻地铁一号线的摩尔大厦基坑为例,分析基坑开挖的施工措施和地下连续墙的变形特征。实践证明,沿着连续墙对基坑内外进行土体加固和盆边留土抽条限时开挖措施,对于减小地铁隧道的变形是非常有效的。 Diaphragm wall was adapted to as exterior-protected construction in tion pit when the displacement was controlled strictly. Construction measurement the design of deep foundaand the deformation of diaphragm wall were discussed based on the Mo'er foundation pit close to metro line No.1. The results showed that foundation consolidation between the inside and outside of the foundation pit and construction in "layered, partitioned, time-limited excavation" were beneficial to the safety of metro tunnel.
出处 《建筑技术》 北大核心 2009年第8期700-703,共4页 Architecture Technology
基金 深圳市科技计划项目(SY200806270077A)
关键词 深基坑 地下连续墙 地铁 加固 deep foundation pit continuous concrete wall metro foundation consolidation
  • 相关文献

参考文献6

二级参考文献15

共引文献170

同被引文献21

引证文献1

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部