财富中心二期公寓楼工程超高层建筑施工临时用水设置 被引量:2

DESIGN AND INSTALLATION IN TEMPORARY APPLICATION TO HIGH-RISE BUILDING CONSTRUCTION IN FORTUNE CENTER (Ⅱ) APARTMENT BUILDING
下载PDF
导出
摘要 财富中心二期公寓楼工程为超高层建筑,施工临时用水的设置采用分阶段、分层次的设置方法,即在工程施工初期设置室外临时用水给水系统,在结构施工阶段设置楼内生产及消防用水系统,在装饰阶段采用正式的消火栓给水系统先行完善、启用的方法;水源选择充分利用施工期间施工降水,并将楼内的施工废水循环利用。与传统作法比较,水资源更节约,消防更安全,操作更简单,运行与维护成本显著降低,具有良好的综合效益。 The project of Fortune Center (Ⅱ) is a high-rise building,the design and installation in temporary application was set by stages and Hierarchically, the outdoor temporary water supply system was set early in construction installation,the production water system and the temporary fire fighting system were set in the stage of construction structure,in the fine fitment stage, we use the formal fire fighting system to take the place of the temporary fire fighting system;we take a good consideration on the usage of downcast water,as well as the wastewater from the building. Compare with traditional methods of work,it was more economical and safer and more simple,the cost of operation and maintenance was reduced prominently,it was a great overall efficiency.
出处 《建筑技术》 北大核心 2009年第8期715-718,共4页 Architecture Technology
关键词 超高层 临时用水 设置 high-rise building temporary water system design and installation
  • 相关文献

参考文献9

  • 1GB50015-2003.建筑给水排水设计规范.[S].,..
  • 2GB 50016-2006,建筑设计防火规范.
  • 3GB50045-2005高层民用建筑设计防火规范.
  • 4DBJ01-83-2003北京市建设工程施工现场消防安全管理规定.
  • 5GB50242-2002.建筑给水排水及采暖工程施工质量验收规范.[S].,..
  • 6GB50236-1998现场设备、工业管道焊接工程施工及验收规范.
  • 7GB50231-1998机械设备安装工程施工及验收通用规范.
  • 8GB50275-1998压缩机、风机、泵安装工程施工及验收规范.
  • 9GB50268-1997.给水排水管道工程施工及验收规范.[S].,..

共引文献315

同被引文献7

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部