摘要
结合秦皇岛某区域热电联产二期工程实际情况,探讨了工程量清单计价模式下热力工程结算控制重点。
Combined with the practical situation of second-phase project of a regional heat and power cogeneration in Qinhuangdao, the emphasis for settlement control of heat engineering under pricing mode based on bill of quantities are discussed.
出处
《煤气与热力》
2009年第8期40-42,共3页
Gas & Heat
关键词
工程量清单计价
热力工程
结算
pricing based on bill of quantities
heat engineering
settlement