摘要
本文主要介绍了由哈尔滨电机厂有限责任公司完成的三峡右岸水轮机水导轴承的安装及调试特点。
The installation and Test of the hydraulic turbine guide beating, which have been installed in three gorges right bank power station by HEC, were introduced primarily in this article.
出处
《大电机技术》
北大核心
2009年第2期43-45,共3页
Large Electric Machine and Hydraulic Turbine
关键词
水导轴承
安装
调试
hydraulic turbine guide bearing
installation
test