摘要
综合分析渭河化肥厂制约德士古水煤浆加压气化合成氨装置长周期满负荷运行的主要因素,介绍了改进措施和改进效果,并提出今后技术改造方向。
Main factors affecting the operation of Texaco coal syrup gasification in Weihe chemical fertilizer plant towards long-term full-loading since inauguration are analyzed. Taken modifications and their effectiveness are introduced. Suggestions for further modification are put forth here.
出处
《化肥设计》
CAS
1998年第3期10-14,共5页
Chemical Fertilizer Design
关键词
加压气化
水煤浆
合成氨装置
气化
limitation, pressurized gasification,main factors , effectivencss