期刊文献+

SBR工艺污水处理厂升级改造工程的优化设计 被引量:3

Optimized Design of Upgrading and Reconstruction Project of Wastewater Treatment Plant Using SBR Process
下载PDF
导出
摘要 在分析某污水处理厂原有SBR工艺设计参数和实际运行情况的基础上,通过升级改造,使出水水质由原一级B标准提高至一级A标准,且系统能耗下降了80 kW.h/103m3,可为当前采用SBR工艺的污水处理厂升级改造提供参考。 Based on the analysis of technological design parameters and actual operation situation of the original SBR process in a wastewater treatment plant, through the upgrading and reconstruction, the effluent quality was upgraded from the original first level B criteria to the first level A criteria, and the energy consumption of the system was decreased by 80 kW . h/10^3 m^3. The upgrading and reconstruction project can provide a reference for other wastewater treatment plants using SBR process.
作者 吴黎明
出处 《中国给水排水》 CAS CSCD 北大核心 2009年第16期53-55,59,共4页 China Water & Wastewater
关键词 SBR工艺 升级改造 脱氮除磷 SBR process upgrading and reconstruction nitrogen and phosphorus removal
  • 相关文献

参考文献2

二级参考文献6

  • 1Hyungjin K, Krishna R P. Competitive growth of Nocardia and Acinetobacter under anaerobicaerobic batch operation [ J]. Water Res,2000,34(10) :2667 - 2674.
  • 2Mamais D A, Andreadakis C N, Kalergis C. Causes of, and control strategies for, Microthrix parvicella bulking and foaming in nutrient removal activated sludge systems [J]. Water Res,1998,34(4/5):9 -17.
  • 3Shao Y J, Starr M, Kaporis K, et al. Polymer addition as a solution to Noeardia foaming problem [ J ]. Water Environ Res,1997, (1) :25 -27.
  • 4Yongwoo H,Toshihiro T. Control of Microthrix Parvicella foaming in activated sludge [ J ]. Water Res, 1998,32 (5) :1678 - 1688.
  • 5秦怀东,邵文卿.污水处理厂泵站与曝气系统的节能途径[J].山西煤炭,2000,20(4):24-26. 被引量:10
  • 6张辰,李春光.浅谈城市污水处理厂的技术改造[J].中国给水排水,2004,20(4):20-23. 被引量:33

共引文献86

同被引文献51

引证文献3

二级引证文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部