期刊文献+

东莞某水质净化厂CEPT工艺技术改造 被引量:1

Technical Reconstruction of CEPT Process in a Wastewater Purification Plant in Dongguan
下载PDF
导出
摘要 东莞某大型水质净化厂采用化学强化一级处理工艺(CEPT)处理污染河道水。该工程于2004年春投入生产运行后,存在出水发黑与发臭的问题。根据该工程的实际情况,对混凝沉淀工艺进行了改造;工程实施后达到了预期效果,有效解决了出水发黑、发臭问题。 A wastewater purification plant in Dongguan adopts chemically enhanced primary treatment(CEPT) for purification of polluted river water. After being put into operation in spring 2004, the project had the problem of black and smelly effluent. Aimed at the actual problems in this project, the coagulation sedimentation process was reconstructed. After the project implementation, the desired result was reached, and the problem of black and smelly effluent was solved.
出处 《中国给水排水》 CAS CSCD 北大核心 2009年第16期56-59,共4页 China Water & Wastewater
关键词 化学强化一级处理 混凝沉淀 复合聚氯化铝 技术改造 chemically enhanced primary treatment coagulation sedimentation polyaluminum chloride technical reconstruction compound
  • 相关文献

参考文献2

二级参考文献4

共引文献22

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部