期刊文献+

SEQUENCING DELIVERIES TO MINIMIZE INVENTORY HOLDING COST WITH DOMINANT UPSTREAM SUPPLY CHAIN PARTNER

SEQUENCING DELIVERIES TO MINIMIZE INVENTORY HOLDING COST WITH DOMINANT UPSTREAM SUPPLY CHAIN PARTNER
原文传递
导出
摘要 This paper studies a two stage supply chain with a dominant upstream partner. Manufacturer is the dominant partner and operates in a Just-in-Time environment. Production is done in a single manufacturing line capable of producing two products without stopping the production for switching from one product to the other. The manufacturer imposes constraints on the distributor by adhering to his favorable production schedule which minimizes his manufacturing cost. Distributor on the other hand caters to retailers' orders without incurring any shortages and is responsible for managing the inventory of finished goods. Adhering to manufacturer's schedule may lead to high inventory carrying costs for the distributor. Distributor's problem, which is to find an optimal distribution sequence which minimizes the distributor's inventory cost under the constraint imposed by the manufacturer is proved NP-Hard by Manoj et al. (2008). Therefore, solving large size problems require efficient heuristics. We develop algorithms for the distribution problem by exploiting its structural properties. We propose two heuristics and use their solutions in the initial population of a genetic algorithm to arrive at solutions with an average deviation of less than 3.5% from the optimal solution for practical size problems. This paper studies a two stage supply chain with a dominant upstream partner. Manufacturer is the dominant partner and operates in a Just-in-Time environment. Production is done in a single manufacturing line capable of producing two products without stopping the production for switching from one product to the other. The manufacturer imposes constraints on the distributor by adhering to his favorable production schedule which minimizes his manufacturing cost. Distributor on the other hand caters to retailers' orders without incurring any shortages and is responsible for managing the inventory of finished goods. Adhering to manufacturer's schedule may lead to high inventory carrying costs for the distributor. Distributor's problem, which is to find an optimal distribution sequence which minimizes the distributor's inventory cost under the constraint imposed by the manufacturer is proved NP-Hard by Manoj et al. (2008). Therefore, solving large size problems require efficient heuristics. We develop algorithms for the distribution problem by exploiting its structural properties. We propose two heuristics and use their solutions in the initial population of a genetic algorithm to arrive at solutions with an average deviation of less than 3.5% from the optimal solution for practical size problems.
出处 《Journal of Systems Science and Systems Engineering》 SCIE EI CSCD 2009年第2期159-183,共25页 系统科学与系统工程学报(英文版)
关键词 Supply chain scheduling production and distribution system logistics genetic algorithm optimized cross over Supply chain scheduling, production and distribution system, logistics, genetic algorithm, optimized cross over
  • 相关文献

参考文献1

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部