期刊文献+

基于最优生产技术的业务过程资源动态随机优化配置 被引量:6

Dynamical stochastic resource allocation optimization for business process based on optimized production technology
下载PDF
导出
摘要 目前在不确定环境下,采用事先定义方式的静态优化配置方法缺乏柔性,难以适应实际业务过程中的动态性与不确定性,而采用共享队列和负载均衡的动态资源配置策略,又缺乏对资源配置的全局优化,不能保证过程执行的整体性能最优。为此,首先采用独立的资源队列和随机概率统计理论,建立了用于资源随机优化配置的业务过程分析模型,然后提出了基于最优生产技术思想的业务过程资源动态随机优化配置的方法,最后以应用实例及仿真实验验证了所提资源配置方法的有效性和优越性。 The exsisting resource static allocation optimization methods with schema were lack of flexibility and adaptability to the dynamics and uncertainties of the real business process execution, and dynamical resource allocation policies with shared queue or load balance had little room for global optimization, so traditional resource allocation methods/policies couldn't guarantee global performance optimization of business process execution under uncertain environments. Therefore, a new method was proposed. In this method, a business process analysis model for dynamical stochastic resource allocation optimization was built with individual resource queue and stochastic probability theory. Then, the dynamical stochastic resource allocation optimization method based on Optimized Production Technology (OPT) was presented. Finally, the effectiveness and advantage of this method were verified by an example and simulation experiment.
作者 谢毅 琚春华
出处 《计算机集成制造系统》 EI CSCD 北大核心 2009年第7期1414-1420,共7页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(70671094) 浙江工商大学青年人才基金资助项目(Q09-21) 浙江省科技厅科研资助项目(2009C21G2050028) 新世纪优秀人才支持计划资助项目 浙江省教育厅基金资助项目(20061084)~~
关键词 业务过程 建模 优化 资源配置 最优生产技术 business process model building optimization resource allocation optimized production technology
  • 相关文献

参考文献19

  • 1张晓光,曹健,张申生,付谦.面向工作流结构优化的扩展关键路径分析[J].上海交通大学学报,2004,38(1):29-33. 被引量:7
  • 2CHANG D H, SON J H, KIM M H. Critical path identification in the context of a workflow[J]. Information and Software Technology,2002,44(7) :405-417.
  • 3SON J H, KIM M H. Improving the performance of time-constrained workflow proeessing[J].Journal of Systems and Soft ware,2001,58(3) :211-219.
  • 4SON J H, KIM J S, KIM M H. Extracting the workflow critical path form the extended well-formed workflow schema[J]. Journal of Computer and System Sciences,2005,70(1) :86-106.
  • 5LI Haibo, ZHAN Dechen. Workflow timed critical path optimization[J].Nature and Science, 2005,3 (2) : 65-74.
  • 6刘胜,范玉顺,尹朝万.基于工作流模型的资源配置优化方法[J].计算机集成制造系统,2005,11(9):1272-1278. 被引量:11
  • 7刘胜,范玉顺.资源约束下实例在工作流中停留时间分析方法[J].电子学报,2005,33(10):1867-1871. 被引量:11
  • 8SENKUL P, TOROSLU I H. An architecture for workflow scheduling under resource allocation constraints[J]. Information Systems,2005,30(5) :399-422.
  • 9SENKUL P, KIFER M, TOROSLU I H. A logical framework for schedul.ing workflows under resource allocation con straints[EB/OL]. [2008-09-10]. http://www. vldb. org/ conf/2002/s20p01, pdf.
  • 10LI Hongclaen, YANG Yun, CHEN T Y. Resource constraints analysis of workflow specifications[J]. Journal of Systems and Software, 2004,73 (2) :271-285.

二级参考文献73

共引文献57

同被引文献33

引证文献6

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部