期刊文献+

世界银行贷款项目的新疆农村公路工程的施工现场管理

Construction Field Management of World Bank Load Project Xinjiang Rural Highway Engineering
下载PDF
导出
摘要 公路工程施工的现场管理是施工管理的核心,现场管理效果的好坏直接影响到工程的质量、进度和效益。将公路工程施工现场管理方法总结为"五个管理、四个原则",并以世行贷款项目新疆农村公路为例,对贯穿工程施工现场全过程的该方法进行详细的阐述,可为确保农村公路建设项目安全、快速、优质、增效的实施提供一个范本。 agement, the effect of which directly impacts the quality, plan and benefit of project. The field management method of highway engineering construetion is summarized as "5 aspects of management,4 principles". Taking Xinjiang rural highway engineering which is World Bank load project as an example, the method pronging the whole process of engineering construction is expatiated in detail,which provides an exemplification for ensuring the safety, speediness, high grade and effect increase of rural highway construction engineering.
出处 《交通标准化》 2009年第15期222-225,共4页 Communications Standardization
关键词 世行贷款 农村公路工程 施工现场 管理 World Bank load rural highway engineering construction field management

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部