三峡右岸地下电站安装6台单机700 MW的发电机组,施工中建立了平面控制网和高程控制网,根据工程进展,进行网点加密和复测,测量成果,提供各施工、监理及金属结构安装单位使用。
6 × 700 MW hydro-generating units are installed in the Three Gorges right-bank underground powerstation. For the convenience of construction, the horizontal control network and elevation control network are set up. Following the advance of construction , adding a certain amount of supplemental control points to the networks timely and surveyed once again. The data are provided for the use of construction, supervision and metalwork installation departments.
出处
《湖北水力发电》
2009年第3期36-38,共3页
Hubei Water Power
关键词
地下电站
施工测量
控制网
underground powerstation
construction survey
control network