摘要
瀑布沟水电站砾石心墙堆石坝,最大坝高186 m,根据施工期监测砾石土孔隙水压力、土压力及沉降变形,说明在砾石土心墙施工时,必须适度地控制含水量和填筑进度。
The Pubugou rock fill dam with gravel-soil core is 186 m high . According to the monitoring data on pore wa- ter pressure, soil pressure and settlement, it is worth notice that the moisture content of the gravel-soil and the construc- tion progress of the core wall must be well controlled.
出处
《湖北水力发电》
2009年第4期42-45,共4页
Hubei Water Power
关键词
砾石土心墙堆石坝
施工期监测
分析
rock fill dam with gravel-soil core
monitoring during construction period
analysis