高坝洲水电厂设备投产运行近10年,经历了初期的设备整治、提高自动化水平、设备老化改造等阶段,对近10年间主要的设备技术改造和进步工作进行了回顾,总结了设备管理经验。
The Gaobazhou Hydropower Plant has been put into operation about 10 years and has gone through the stages of putting equipment in order, raising automatic level and renovating aged equipment. The technical reform achievements and experience on equipment management are reviewed.