摘要
通过对高坝洲电厂原电气主接线及改造后的电气主接线的对比分析,指出:经过改造后电气主接线大大提高了电站的经济效益、系统稳定性、操作灵活性。
The comparative analysis on the performance of the reformed main electrical connection scheme of Gaobazhou Hydropower Plant with the original shows that the operating flexibility and system stability are improved, and the eco- nomical benefits are raised.
出处
《湖北水力发电》
2009年第4期70-72,共3页
Hubei Water Power
关键词
高坝洲水电站
水电厂
电气主接线
Gaobazhou Hydropower Station
Hydropower Plant
main electrical connection