摘要
介绍了高坝洲水电厂机组的特点及上导结构,并对2号机组上导改造原因及改造的具体措施进行了总结。
The structural features of the hydrogenerators of Gaobazhou Hydropower Plant are described, and the practical renovating measures for the upper guide bearing supports of generator No. 2 are summarized.
出处
《湖北水力发电》
2009年第4期75-76,共2页
Hubei Water Power
关键词
高坝洲电厂
上导轴承
改造
Gaobazhou Hydropower Plant
upper guide bearing
renovation