二滩水电站土建工程国际合同实施中若干问题的反思

Review on several problems in the implementation of the international civil engineering construction contracts of Ertan Hydropower Station
下载PDF
导出
摘要 二滩水电站土建工程国际合同文本实施已近7年,实践证明它是较好的合同样本。当然,在分标、工程量报价单编制方式、单价分析表、技术条款、商务条款等方面也存在着有待改进之处。从中进行反思使我们认识到,虽任何合同很难做到尽善尽美,但通过实践,总结经验,可有利于今后其他工程参考供鉴。 It is proved that the international contract of civil engineering construction for Ertan Hydropower Station is a good model since it has practiced for about 7 years. Of course, some articles would be improved, such as bid division, preparation for the quoted price list of project quantities, analysis table of unit price, technical articles, commercial articles, etc.. Through the review, we recognized that it is difficult to perfect a contract, but summing up the experience in the practice could be favorable to other future projects.
作者 蔡新鉴
出处 《水力发电》 北大核心 1998年第7期8-11,共4页 Water Power
关键词 土建工程 国际合同 合同管理 实施 二滩水电站 civil engineering, international contract, contract management, bid document preparation, contract implementation, experience summary, Ertan Hydropower Station
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部