户宋河电站主坝为混合花岗岩风化料均质土坝,坝高45m,坝顶长249.08m。本文结合坝址处的工程自然条件,介绍户宋河主坝的坝型选择、主坝设计及修改完善过程、坝料碾压试验及施工和施工质量控制。
The main dam of the Husonghe Hydropower Station is a homogeneous earth structure composed of weathered granite material, 45m high and 249.08m long. This paper gives a presentation of type selection, design and its optimization of the main dam, as well as its roller compaction test,construction and quality control on the basis of the natural and topographical conditions at the dam site.
出处
《云南水力发电》
1998年第2期33-37,共5页
Yunnan Water Power
关键词
主坝
设计
施工
均质土坝
水电站
Husonghe Hydropower Station Design of main dam Construction of main dam