摘要 户宋河电站主坝设计为L型排水体的均质坝,该坝就地取材,是我省首次采用风化花岗岩土料填筑的土坝。施工中监理、施工单位及复核单位对大坝进行了全面的、科学的、规范化的质量控制与监测。监测结果表明,填筑质量好,各项指标完全满足设计要求,总合格率为98.4%。经一年蓄水和观测表明,主坝运行正常。 The main dam of the Husonghe Hydropower Station is a homogeneous earth structure with a L_shaped drainage system, which is the first dam embankment built using the locally available weathered granite earth material in this province. During construction of the dam the construction supervisor, the contractor and the monitoring agency carried out an overall, scientific and standardised quality control and monitoring of the dam embankment. The monitoring results indicate that all of the indexes of the earth placement fully satisfied the design requirements and the quality qualification rated is 98.4%. The one year's impounding and observation proved that main dam is functioning normally.
作者 保华富 黄英
出处 《云南水力发电》 1998年第2期27-32,共6页 Yunnan Water Power
关键词 土料填筑 质量控制 检测分析 均质土坝 水电站 Husonghe Hydropower Station Earth Placement Quality control Dry density Compactness,
  • 相关文献

同被引文献15

  • 1保华富,金波,张春.暮底河水库大坝心墙压实质量检测和成果分析[J].云南水力发电,2004,20(4):72-77. 被引量:4
  • 2罗祯皆,王望红.持续高强度填筑防渗土的质量控制[J].水利水电技术,2005,36(12):30-32. 被引量:2
  • 3白耀华,王兆农,田建林.鸭子荡水库大坝宽级配土料筑坝研究与实践[J].中国农村水利水电,2006(12):115-117. 被引量:1
  • 4杨萌华.土石料压实和质量控制[M].北京:水利电力出版社,l992.
  • 5中华人民共和国电力部.DL/T5129-2001碾压式土石坝施工规范[S].北京:电力出版社,2001.
  • 6中华人民共和国国家经济贸易委员会.DL/T5129--2001碾压式土石坝施工规范[s].北京:中国电力出版社,2001.
  • 7.DL/TS129-2001 碾压式土石坝施工规范[S].北京:电力出版社,2001..
  • 8.SL274-2001 碾压式土石坝设计规范[S].北京:电力出版社,2001..
  • 9.SL237-1999 土工试验规程[S].北京:水利电力出版社,1999..
  • 10中华人民共和国水利部.SL237-1999土工试验规程[S].北京:中国水利水电出版社,1999:114—120.

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部