期刊文献+

预应力高强混凝土管桩(PHC桩)在衡阳地区的应用

Application of Prestressed High Strength Concrete Pipe Pile (PHC Pile) in Areas of Hengyang
下载PDF
导出
摘要 该文分析了衡阳地区桩基础施工工艺现状,介绍了预应力高强混凝土管桩应用条件。结合工程实例,分析了预应力高强混凝土管桩在衡阳地区应用效果,并对施工中存在的问题提出了相应对策。 This paper analyzes the present situation of pile foundation construction technology in Hengyang, introduces the application condition of prestressed high strength concrete pipe pile. Combined with engineering practice, the paper analyzes the application effect of prestressed high strength concrete pipe pile in Hengyang, and puts forward the relative countermeasures for the problems existing in the construction.
作者 张良华
出处 《城市道桥与防洪》 2009年第8期151-154,共4页 Urban Roads Bridges & Flood Control
关键词 预应力高强混凝土管桩 应用条件 应用效果 湖南衡阳 prestressed high strength concrete pipe pile, application condition, application effect, Hengyang in Hunan
  • 相关文献

参考文献5

  • 1GB13467-1999.先张法预应力混凝土管桩[S].
  • 203SG409,预应力混凝土管桩[S].
  • 3JGJ94-94.建筑桩基技术规范[S].[S].,..
  • 4GB50007-2002.建筑地基基础设计规范[S].[S].,..
  • 5JGJ72-2004,高层建筑岩土工程勘察规程[S].

共引文献2514

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部