高速公路建设管(杆)线拆迁费用估算探究

Probing into Dismounting Fee Estimation of Construction Pipelines (Poles) in Expressway
下载PDF
导出
摘要 导致工程超概算的原因很多,如宏观经济政策的变化、不可抗力的影响、工程的变更以及工程可行性研究费用的估算不足等。随着城市化进程的加快,绕城和延伸线等高速公路规划向城市靠近,高速公路建设所需拆迁管(杆)线的数量及拆迁难度随之增大。其拆迁费用的估算,值得探究。该文介绍的有关经验可供类似工程参考。 There are many causes i.e. the variety of macroscopic economic policy, force majeure influence, engineering alteration, and lack estimation of engineering feasibility study fee to lead the over-budgetary estimation of the project. With the speeding up of urbanization course, the planning of expressway around city and extending line is closing to the city. The quantity of pipeline and pole required to dismount for the construction of expressway and the dismounting difficulty are increased with it. It is worth to probe into the estimation of its dismounting fee. The relative experience introduced in the article can be referred for the similar project.
作者 范与李
出处 《城市道桥与防洪》 2009年第8期163-165,共3页 Urban Roads Bridges & Flood Control
关键词 高速公路 管(杆)线 拆迁费用 估算 expressway, pipeline (pole), dismounting fee, estimation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部