摘要
针对引进的电站锅炉受压元件资料审查、现场检验和水压试验等各项目检查中,发现的缺陷和问题进行分析,并提出建议。
The paper introduces the inspection on the import boiler for power plant, which items inculde the document audit,test on site and hydrostatic test after installment. The analysis on the defect as well as suggestion on the safety operation and management is also discussed.
出处
《中国锅炉压力容器安全》
1998年第4期50-52,共3页
China Boiler and Pressure Vessel Safety