摘要
控制系统调试是控制系统投入运行前的重要环节。结合工程实例,阐述矿石码头控制系统皮带机保护装置调试、现场设备机侧启动调试、PLC系统调试、皮带机系统联合调试、调试流程、调试步骤以及中央控制室操作过程和彩色图形处理器屏幕显示内容等,可供同类散货码头控制系统调试工作参考。
The testing of control system is an important link before the system is put into operation. Citing the engineering practical examples, the testing of equipment of the iron ore terminal, including the test on belt conveyor protective devices,the test on equipment local starting,the test on the PLC system,the test on linked operation of belt conveyor system, the test on flow paths and the test procedures, as well as the display contents on the monitor of Colour Graphic Processor all are elaborated. Which will provide the references for the testing of the control system in the bulk cargo handling terminal.
出处
《港工技术》
2009年第4期9-12,共4页
Port Engineering Technology
关键词
控制系统
皮带机保护装置
可编程序控制器
调试
control system
device for the protection of the belt conveyers
programmable logic controller (PLC)
testing