摘要
在大埔水电站100t级船闸上引航道导航墙和靠船墩工程施工中,采用黄土围堰代替草土围堰,在砂卵石河滩上,用粘土置换砂卵石来形成粘土防渗幕,代替高压喷射灌浆防渗处理,在基坑排水中采用“堵、围、引”等措施,仅用100天就优质地完成了施工任务。
In the construction of the upper leading channel's navigation wall and breasting dolphin of the Dapu hydropower station's 100t ship lock ,the constructers used loess cofferdam to replace turf cofferdam,and replaced sandy gravel with clay to form clay seepage prevention membrane curtain in sandy gravel alluvial flood land. And they also used countermeasures of 'plugging,enclosing, guiding, etc.' for draining excavation's water to replace highpressure jet grouting. They well accomplished the construction task just in 100 days.
出处
《广西水利水电》
1998年第2期66-67,69,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
基础防渗
软岩保护
船闸
导航墙
施工技术
countermeasures of deformation prevention, soft rock protection,soft rock excavation and drainage,base seepage prevention