2蔡洋 彭淳绍 王积荣 等(Cai Yang Peng Chunshao Wang.Jirong et al).电网调度自动化开发与应用的调查及建议(Invcstigation and suggestions on development and application of electric power dispatch automation system)[J].电网技术 (Power System Technology),2000,24(1):4-9.
3Tomek L, Mainkar V, Geist RM, et al. Reliability modeling of lifecritial, real-time system[J]. Proceedings of the IEEE, 1994, 82(1): I08 - 121.
4Liestman AL. A fault-tolerance scheduling problem[J].IEEE Trans on Software Engineering, 1998, (12) : 1089 - 1095.
5Lauzac S,Melhem R, Mosse D. Adding fault-tolerance to p-fair realtime scheduling[A]. MA: Workshop on Embedded Fault-Tolerant Systems[C], 1998. 34-37.
6Littlewood B.Limits to Evaluation of Software Dependabilit [R].No.Ds Project 3092-PDCS,City University,1990.
7Podgurski A,Yang C,Masri W,et al. Partition Testing, Satisfied Smpling, and Cluster Analysis [C].Proceeding of ACM Symposium on the Foundations of Software Engineering, 1993.7-10.
8Littlewood B.Software Reliability Model for Modular Programming Structure [J].IEEETrans. on Reliability, 1979,28(3):241-246.
9Smidts C,Sova D.An Architectural Model for Software Rliability Quantification:Sources of Data[J].Reliability Engineering and System Safety,1999,64(2):279-290.
10Howden W H. Good Enough Versus High Assurance Software Testing and Analysis Methods [C].Proceeding of IEEE High Assurance Software Engineering,1998.166-175.