对外承包水电站建设项目的风险管理规划研究

A Case Study of Risk Management Planning for International Hydropower Construction Contracting
下载PDF
导出
摘要 施工企业"走出去"承包工程面临着许多风险。为了做好风险管理,就需要运用系统的风险管理方法,包括风险识别、风险定性分析、风险定量分析、风险应对措施规划和风险监控。在了解项目风险管理知识的基础上,结合案例讨论应该如何在综合考虑事业环境因素、组织过程资产和项目资料的基础上,进行风险识别、分析和应对措施规划等,以便为类似项目的高层次风险管理规划提供参考,也为更细节层次上的风险管理规划打下基础。 It is a risky undertaking to go abroad for construction contracting. In order to manage risks well, we need to use systematical risk management methodology, including risk identification, risk qualitative analysis, risk quantitative analysis, risk response planning, and risk control This paper firstly summarizes the project risk management knowledge, and then uses a case to demonstrate how to do risk identification, risk analysis and risk response planning on the basis of considering Enterprise Environmental Factors, Organizational Process Assets and relevant project documents. The case could be used as a reference for similar projects' high-level risk management planning and also a good starting point for lower-level risk management planning.
出处 《水力发电》 北大核心 2009年第7期73-77,共5页 Water Power
关键词 国际工程 工程承包 水电工程 风险管理规划 案例 international project construction contracting hydropower project risk management case
  • 相关文献

参考文献3

  • 1中国商务部网站:http://hzs.Inofcom.gov.cn/aarticle/date/200901/20090106004132-html.
  • 2项目管理协会.项目管理知识体系指南(第4版)[M].北京:电子工业出版社.2009.
  • 3国际咨询工程师联合会.生产设备和设计-施工合同条件(1999年第1版)[M].北京:机械工业出版社,2003.

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部