摘要
介绍了方山资源综合利用电厂运行现状;为了充分利用煤矸石、煤泥等劣质燃料,同时满足当地供热需求,方山电厂要对3#机组进行技术改造;探讨了技改的装机方案、机组选型、接入系统方案及投资额等内容。
Present status of Fangshan Power Plant constructed for comprehensive utilization of resources introduced;for complete utilization of inferior fuel as coal refuse and sludge and simultaneously satisfying local need of thermal heating,the #3 generator set was technically converted;which work included options of technical conversion,selection of generator set,option of connecting system and amount of investment estimated.
出处
《煤炭加工与综合利用》
CAS
2009年第3期42-45,共4页
Coal Processing & Comprehensive Utilization
关键词
资源综合利用
电厂
煤泥
煤矸石
热电联产
改造
comprehensive utilization of resources
power plant
coal sludge
coal refuse
co-production of heat and electricity
conversion