期刊文献+

缅甸DAPEIN(Ⅰ)水电站取水防沙问题研究 被引量:2

Study on Water-inlet and Sediment Control of DAPEIN(Ⅰ) Hydropower Plant in Burma
下载PDF
导出
摘要 为解决缅甸DAPEIN(Ⅰ)水电站泥沙通过排沙管道或泄流口不致于淤塞库区且避免泥沙流入电厂的问题,分析了取水防沙原设计方案试验中存在的问题,指出冲砂底孔进口上延方案为最优取水防沙方案,探讨了该优化方案在不同工况下的取水防沙效果,提出了运行时应注意的事项。 For solving the problem of DAPEIN ( Ⅰ )Hydroelectric Station in Burma, which defenses sediment through sediment dejection pipeline or outlet silting up reservoir area and avoids it inflowing into the hydroelectric station, in the paper, it analyzes the issue existed in the original scheme experiment of water-inlet and sediment control, points out that the optimal method is sand flushing bottom-hole extending to the upstream way, discusses the effect of the optimal method in different condition, puts forward events should be paid attention to.
出处 《水电能源科学》 北大核心 2009年第4期91-93,87,共4页 Water Resources and Power
关键词 水电站 取水口 取水防沙 试验 冲砂底孔 hydropower plant water intake water-inlet and sediment control experiment sand-washing bottom-hole
  • 相关文献

参考文献5

  • 1江西省水利规划设计院.DAPEIN(I)水电站可行性研究报告[R].南昌:江西省水利规划设计院,2007.
  • 2武汉水利电力学院河流泥沙工程学教研室.河流泥沙工程[M].北京:水利出版社,1982.
  • 3陆晶,付文军,段兴平.缅甸DAPEIN(I)水电站工程首部枢纽水工、泥沙及导流整体模型试验研究[D].武汉:武汉大学,2008.
  • 4李立刚.小浪底工程泥沙淤积的防治对策[J].水电能源科学,2005,23(6):62-65. 被引量:3
  • 5赵若雨,赵直,林岚.辽河下游泥沙治理措施初探[J].东北水利水电,2008,26(12):17-18. 被引量:2

二级参考文献8

共引文献3

同被引文献9

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部