基于FAHP的水利工程项目成本风险管理研究 被引量:19

Research on Cost Risk Management of Water Conservancy Engineering Project Based on FAHP
下载PDF
导出
摘要 针对我国水利施工企业的工程项目成本管理较大程度上仍延续计划经济时期的粗放式管理,应用风险管理理论对水利工程项目成本风险因素进行识别,建立了风险因素的层次结构,将层次分析法在模糊环境下进行扩展,引入三角模糊数的概念构建了水利工程项目成本风险评价模型并进行了实例应用。结果表明,应用水利工程项目成本风险管理可提高水利施工企业工程项目成本精细化管理水平,取得了良好的成本管理效果。 Aiming at the water conservancy construction management which was used in the planned economic period water conservancy engineering project are recognized in this structure of the factors is established, AHP is expanded at enterprises in our country are still using the extensive style to a great extent. According to this, the cost risk factors of thesis by using risk management theory, and a hierarchical the fuzzy environment, cost risk comprehensive evaluation model is established by introducing triangular fuzzy numbers, and be used in application example. By making empirical analysis, it shows that the cost refinement management level of the construction enterprise is improved and the construction enterprise obtains a good effect on the cost management by using cost risk management.
出处 《水电能源科学》 北大核心 2009年第4期151-154,共4页 Water Resources and Power
基金 国家自然科学基金资助项目(50779020)
关键词 模糊层次分析 水利工程项目成本 三角模糊数 成本风险管理 fuzzy analytic hierarchy process cost of water conservancy engineering project triangular fuzzy numbers cost risk management
  • 相关文献

参考文献5

二级参考文献39

共引文献545

同被引文献152

引证文献19

二级引证文献192

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部