摘要 为了满足平煤八矿二水平400万t/a设计生产能力的要求,依据《八矿二水平延伸工程》任务委托书和后期八矿二水平工程汇报书,介绍了八矿二水平供电方案的设计原则、二水平的采区划分、采面布置及运输通风系统的新变化。根据各大系统的变化,提出了供电系统初步方案,并对方案的可行性进行了探讨。 In order to meet the needs of 4,000,000 tons / year design capacity of the second level in Pingdingshan No. 8 Mine,based on the task instructions of " the extension project of the second levels" , and the late project reporting requirements book of the second level in Pingdingshan No. 8 Mine,the author described design principle of the power supply of the second level in Pingdingshan No. 8 Mine, the division of mining area of the second level, the layout of mining area, and the new changes of transport arrangements and ventilation system and so on. According to major changes in these systems, this paper proposed the initiatory plan design of power supply. At the same time, the author discussed the feasibility of the power supply.
作者 张立群
出处 《中州煤炭》 2009年第8期32-34,共3页 Zhongzhou Coal
关键词 供电方案 井下供电 矿井设计 power supply plan underground power supply mine design
  • 相关文献

参考文献3

  • 1国家安全生产监督管理局,国家煤矿安全监察局.煤矿安全规程[M].北京:煤炭工业出版社,2001.
  • 2胡本臣,等.煤矿电工手册[M].北京:煤炭工业出版社,1987.
  • 3中国煤炭建设协会.煤矿工业矿井设计规范[S].北京:中国计划出版社,2005.

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部