隧道施工断面快速测量方法

The Method of Tunnel Cross-section Rapid Measurement
下载PDF
导出
摘要 在隧道施工断面测量过程中,在最小投入的前提下,采用极坐标法能够及时为施工提供可靠的测量数据,准确地指导断面施工。而三维坐标段落法,只需测量任意点的三维坐标即可计算其偏差,全面地反映整个段落任意桩号各个点的超欠挖情况。 Cross-section measurement in the tunnel construction process, under the minimum investment used the polar coordinates method for the construction could provide reliable data and accuracy to guide the construction But three section-dimensional coordinates paragraph method just measures the three-dimensional coordinates of any point that could calculate the deviation, then it could comprehensively reflect the need to dig where between the different point.
出处 《测绘》 2009年第4期184-187,共4页 Surveying and Mapping
关键词 隧道断面 测量 极坐标法 三维坐标段落法 Tunnel cross section Measurement Polar coordinates method Three section-dimensional coordinate paragraph method
  • 相关文献

参考文献4

  • 1王毅才.隧道工程[M].北京:人民交通出版社,2000.126-147.
  • 2李青岳,等.工程测量学[M].北京:测绘出版社,2005.
  • 3陈龙飞,等.工程测量[M].山东:同济大学出版社,1998.
  • 4赵国忱.缓和曲线横断面方向的确定[J].矿山测量,2003,31(2):41-41. 被引量:3

二级参考文献2

共引文献115

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部