期刊文献+

戈兰滩水电站水库水温数值分析 被引量:1

Numerical Analysis on Reservoir Water Temperature of Gelantan Hydropower Station
下载PDF
导出
摘要 戈兰滩水电站建成后,正常蓄水时坝前水深超过百米,水库水温分布成为大坝设计、施工、运行管理及水环境保护工作的重要基础资料。为获取水库水温分布状况,满足工程需要,文章作者采用数值计算方法,重点分析和预测水库垂向水温分布,这种水温分布预测结果较好地反映了戈兰滩水电站水库的实际情况。 After Gelantan Hydropower Station is constructed, water depth before the dam under normal im- poundment is more than 100m. The distribution of reservoir water temperature becomes important for dam design, construction and operation management as well as water environment protection. In order to learn about the distribution of reservoir water temperature, numerical calculation method is used to analyze and predict vertical water temperature distribution of the reservoir. Such prediction better indicates practical conditions of the reservoir.
出处 《红水河》 2009年第4期61-64,共4页 Hongshui River
关键词 水库 一维模型 水温结构 戈兰滩水电站 reservoir one-dimensional model water temperature structure Gelantan Hydropower Station
  • 相关文献

参考文献3

二级参考文献8

  • 1沈晋,环境水文学,1992年
  • 2殷学鹏,水利水电环境,1991年,1期
  • 3李怀恩,陕西机械学院学报,1990年,4期
  • 4李玉梁,水环境中污染物扩散输移原理与水质模型,1989年
  • 5刘少文,人民长江,1987年,6期
  • 6李怀恩,陕西机械学院学报,1987年,4期
  • 7范乐年,水利水电科学研究论文.17,1984年
  • 8安艺周一,大型水利工程环境影响译文集,1981年

共引文献83

同被引文献6

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部