老挝南塔1号水电站征地移民安置规划设计 被引量:2

Design of Land Requisition and Resettlement Program for Nam Tha 1# Hydropower Station in Laos
下载PDF
导出
摘要 老挝南塔河1号水电站装机容量为168 MW,电站征地需安置移民9 299人,在老挝属于移民人数多、安置难度大的项目,移民安置规划设计是影响电站能否顺利推进的关键因素之一。通过介绍该电站征地移民安置规划的设计思路和做法,可为老挝或其他部分东南亚国家类似工程移民规划提供参考和借鉴。 There is a population of 9,299 that need to be resettled due to the construction of Nam Thai 1# Hydropower Project with an installed capacity of 168MW in Laos. The resettlement planning becomes the key factor that determines whether the project can proceed smoothly or not, because it is very difficult to relocate so many people. The introduction of resettlement program design for the station is to provide some references and lessons for other similar hydropower projects in Laos or any other Asian countries.
作者 覃元义
出处 《红水河》 2009年第4期88-92,共5页 Hongshui River
关键词 征地移民 安置规划 南塔河1号水电站 land requisition and resettlement resettlement plan Nam Tha 1# Hydropower Project
  • 相关文献

参考文献1

  • 1广西电力工业勘察设计研究院.老挝南塔河1#水电站移民安置行动计划[R].南宁:广西电力工业勘察设计研究院,2008.

同被引文献21

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部