摘要
介绍国华沧东发电有限责任公司低温多效加蒸汽压缩喷射器海水淡化系统的施工过程和方法,并分析系统安装过程中应注意的问题。
The process and measures to LT-MED and TVC desalination system of Guo Hua Cang Dong Power Plant are introduced,and the mattenive problems during system installation are analyzed.
出处
《河北电力技术》
2009年第2期52-53,共2页
Hebei Electric Power