摘要
介绍了正常情况下混凝土桩的灌注过程,如何进行计算首批灌注混凝土的数量,并提出了如何解决混凝土桩灌注堵管问题,论述了特殊地质条件下超灌量大的混凝土桩的灌注过程和方法,从而保证混凝土桩的施工质量。
Pouring process of concrete pile under normal conditions is introduced.The calculation method of initial pouring amount of concrete is presented.In view of pipe blocking question encountered in pouring process corresponding resolving measures are proposed.In the end the pouring process and method of concrete pile under particular geological conditions with extra pouring amount are discussed,in order to ensure the construction quality of concrete pile.
出处
《山西建筑》
2009年第25期140-141,共2页
Shanxi Architecture
关键词
混凝土桩
混凝土初凝时间
灌注过程
堵管
concrete pile
initial setting time
pouring process
pipe blocking