摘要
结合某工程沉管灌注桩工程实例,通过桩的动测法实验和静载实验,检测桩的施工质量。针对沉管灌注桩施工过程中容易发生的质量问题,提出相应的处理措施,并提出改进的沉管灌注桩施工方法。
Based on a construction project of settling tube cast-in-place pile,Constructor carried dynamic test and static test to check the piles construction quality.Authors introduced some quality problems that often occured in the settling tube cast-in-place pile construction.Constructor introduced the corresponding technical treatment measures and proposed improved construction technology method.
出处
《水科学与工程技术》
2009年第3期56-58,共3页
Water Sciences and Engineering Technology
基金
河北省建工新产品试制费资助项目(2008-105)
关键词
沉管灌注桩
质量问题
检测
处理措施
施工
settling tube cast-in-place pile
quality problem
detection
measurement
construction.